Skip to the main content
The Crier

Manufacture of Walkway for No. 2 Dock, Portsmouth Historic Dockyard

Your saved contracts

What the buyer wrote

Fabrication of a metal mesh walkway to take visitors from HMS Victory ship exit, horizontally along dock steps. Fabrication of bespoke metal staircase to lead down to dock bottom. Fabrication of a second walkway to run along the dock bottom. Fabrication of handrails for existing stone stairs, as emergency egress. All to be built to the specification of the architects' design.

Details

What the buyer calls it
Manufacture of Walkway for No. 2 Dock, Portsmouth Historic Dockyard
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
13 Jan 2020
Work ends
22 May 2020

Who the buyer named

Ethan Fleming was the named contact on this notice.

tenders@nmrn.org.uk