Marine Engineering Study for a floating barge in the River Lea - Meridian Water
What the buyer wrote
As part the Meridian Water overall meanwhile use and placemaking strategy; LBE are looking into proposals for a floating pool within the River Lea Navigation. LBE considers that the scheme has potentially both commercial and community enhancement merit and should be explored further. To properly assess, a feasibility study will be required.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Marine Engineering Study for a floating barge in the River Lea - Meridian Water
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 28 Oct 2019
- Work ends
- 31 Jan 2020
- Kind of work
- Structural and civil engineering consultancy
Who the buyer named
Doreen Manning was the named contact on this notice.
