Mercury Bridge (No 37) Accident Damage Repairs
What the buyer wrote
Carefully dismantle any loose, displaced or damaged stone from the existing structure. Rebuild spandrel and parapets using a mixture of recovered, repaired and new stone. New stone is Dunhouse Buff and is to be kept to one area as much as possible during rebuild.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Mercury Bridge (No 37) Accident Damage Repairs
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 20 Feb 2017
- Work ends
- 3 Apr 2017
- Kind of work
- Civil engineering and groundworks