Skip to the main content
The Crier

Mere's Mouth Re-Surfacing

Your saved contracts

What the buyer wrote

Re-surface the Mere's Mouth area in Diss with high quality surfacing treatment. The area includes the pedestrian / vehicle accessible area in front of Diss Mere with a paved footpath separating two sections (185 sqm); the area leading around the Mere past the supermarket and along Madgett's Walk (330sqm) and the small area just into Diss Park from Madgett's Walk, just beyond the fishing platform (10sqm). Specification as follows: • To scrape clear the existing surface area • To break up and excavate the existing surface area to the required depth • To cart all spoil off site to tip • To back fill the excavated area & level all holes / low areas where required to form a solid l…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Mere's Mouth Re-Surfacing
How they are buying
Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
Suitable for small firms
The buyer says yes. What that is worth
Work starts
2 Mar 2020
Work ends
27 Mar 2020

Who the buyer named

Sonya French was the named contact on this notice.

sonya.french@diss.gov.uk