What the buyer wrote

The Coal Authority is looking for a specialist contractor to undertake the removal and replacement of temporary transfer pipe work and sea outfall, conveying water from the No.2 shaft at the former Michael colliery at East Wemyss in Fife to a discharge point 25m beyond the Mean Low Water Springs (MLWS) in the Firth of Forth, with a permanent installation. The works shall comprise of the site clearance of the existing infrastructure and the detailed design and construction of a pumping station, control building, working platform and outfall pipe line. This shall include the design and implementation of any additional ground investigations and other required surveys to inform the detailed d…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Michael Sea Outfall Design and Build (EV00261)
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
1 Dec 2020
Work ends
31 Aug 2021

Who the buyer named

Helen Baldwin was the named contact on this notice.

helenbaldwin@coal.gov.uk