What the buyer wrote
The Coal Authority is looking for a specialist contractor to undertake the removal and replacement of temporary transfer pipe work and sea outfall, conveying water from the No.2 shaft at the former Michael colliery at East Wemyss in Fife to a discharge point 25m beyond the Mean Low Water Springs (MLWS) in the Firth of Forth, with a permanent installation. The works shall comprise of the site clearance of the existing infrastructure and the detailed design and construction of a pumping station, control building, working platform and outfall pipe line. This shall include the design and implementation of any additional ground investigations and other required surveys to inform the detailed d…
Details
- What the buyer calls it
- Michael Sea Outfall Design and Build (EV00261)
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 1 Dec 2020
- Work ends
- 31 Aug 2021
- Kind of work
- New build construction
Who the buyer named
Helen Baldwin was the named contact on this notice.
