AVBC are seeking a suitably qualified and experienced civil engineering/construction service provider to undertake works to prevent/reduce river bank erosion to help protect nearby structures. This project requires the repair and reinforcement of the existing river bank together with necessary repairs to the footpath on top of the river bank that has suffered from erosion resulting in damage to the tarmac footpath surface. The affected length of the river bank and footpath is on the northern side of the River Derwent and where the river is reasonably fast flowing . Additional information: Quotes need submitting by 12.00 noon on the 30/08/2019-via email to the author (email below). A…
Details
- What the buyer calls it
- Milford River Bank Reinforcement Works
- How they are buying
- Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
- Type
- works
- Work starts
- 15 Sep 2019
- Work ends
- 25 Oct 2019
- Kind of work
- Construction
Who the buyer named
Paul Marshall-Day was the named contact on this notice.