Mine Water Treatment Scheme (MWTS) - Panel Relocation
What the buyer wrote
The Mining Remediation Authority have two Mine Water Treatment Scheme (MWTS) sites with solar PV installed that have missing or damaged solar panels. The sites are Dawdon MWTS and Bates MWTS. Both of these sites share the same 270w solar panels, in terms of manufacturer and model number. We would like to relocate missing panels from Dawdon MWTS with panels located at Bates MWTS. Sourcing rationale A total of four quotes were requested and three were received from local SMEs. A comparison matrix was compiled, assessing cost, capacity, and overall suitability to determine the best fit supplier. This approach was selected over a full tender process as the contract value falls below the releva…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Mine Water Treatment Scheme (MWTS) - Panel Relocation
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Work starts
- 30 Sep 2025
- Work ends
- 31 Oct 2025
- Where
- in the East Midlands
- Kind of work
- Renewables and building decarbonisation
Who the buyer named