Skip to the main content
The Crier

Modification and installation of control dampers and fumigation dampers

Your saved contracts

What the buyer wrote

The CL4 facility is one of the most critical areas on site and the HSE carry out audit’s on a regular basis. It is their recommendation that we ensure that the ETP’s and inner corridors have gas tight dampers so fumigation can take place in case of a spill. Secondly suite 2 had work done to improve control on pressures and air supply and it is now intended to upgrade Suite 1 to the same level which was also endorsed by the HSE. Project Objectives To purchase and install the correct fumigation dampers within the ETP’s and inner corridor. Operation and the function of the dampers to be integrated into the current fumigation system. This would include specific 13amp sockets etc. and meet t…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Parker Air Conditioning£90kends (30 Jun 2016)

Details

What the buyer calls it
Modification and installation of control dampers and fumigation dampers
How they are buying
The buyer did not say
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
7 Dec 2015
Work ends
30 Jun 2016

Who the buyer named

Procurement was the named contact on this notice.

purchasing@nibsc.org