Modifications to the existing Metrolink Tram Management System resulting from operationally critical changes
What the buyer wrote
A key element of TfGM’s Metrolink System is a safety critical system, known as the Tram Management System (‘’TMS’’) which covers 147 trams, 102.67 km of track and 99 tram stops. TfGM is developing a strategy for the re-procurement of a new or substantially new tram management system and associated on-going support (including renewal, replacement and modifications) of a new tram management system. It is anticipated that this will be the subject of a procurement under the proposed new contracting regulations expected to be introduced in early 2024. TfGM will require the ongoing support in respect of a variety of operationally critical upgrades and/or modifications to TfGM’s current Tram Manag…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Modifications to the existing Metrolink Tram Management System resulting from operationally critical changes
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Type
- works
- Where
- in the North West
- Kind of work
- Construction
Who the buyer named
Imran Lobania was the named contact on this notice.
