What the buyer wrote

CPI have identified a requirement for an Uninterruptable Power Supply (UPS) at our Printable Electronics (PE) facility based in Sedgefield, County Durham. The system we propose is likely to be a three phase diesel generator with a UPS acting as a buffer. The winning vendor needs to ensure that continous power supply is provided to the building with a seamless changeover in the event of mains power failure. PE is a standalone facility with its own substation located in NET Park, Sedgefield. Unfortunately due to the amount of redevelopment works in this location full power outages and Brownouts are common occurrence. CPI require the winning vendor to design, supply and install an uninterrup…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

A&M Generators Limited£600kends (18 Nov 2022)

Details

What the buyer calls it
MT1238-702-001 Design, Supply, Installation and Commissioning of a Generator with UPS
How they are buying
Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
Type
goods
Suitable for small firms
The buyer says yes. What that is worth
Work starts
16 Nov 2018
Work ends
18 Nov 2022

Who the buyer named

CPI Procurement was the named contact on this notice.

e-tendering@uk-cpi.com