National Collections Centre - Wroughton - Hangar Door Replacement
Science Museum Groupworks
What the buyer wrote
Replacement of south-western elevation L3 Hangar door due to poor structural condition. Works to include removal of current sliding doors and installation of roller shutter in conjunction with door manufacturer and client structural engineer, as well as structural remedial works outlined in documents 5-5.3.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- National Collections Centre - Wroughton - Hangar Door Replacement
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 1 Mar 2019
- Work ends
- 31 Jul 2019
Who the buyer named
Tim Neal was the named contact on this notice.
