NCC258 Design and Build of County Hall Solar Carport, Battery Storage and Electric Vehicle Charging Points

Your saved contracts

What the buyer wrote

The Contracting Authority has a requirement for a Contractor to undertake the design and build (RIBA stages 4-6) of an 800KW solar photovoltaic car port, 400KW battery storage, 10 rapid electric vehicle charging points and 50 fast electric vehicle charging points installed in the rear car park of its County Hall office building. The Contracting Authority requires the system to integrate an energy management system that maximises the use of the solar within the building and the electric vehicle charge points. The system must have a lifespan of not less than 25 years and should be designed and installed accordingly. Further details of the Contracting Authority's requirements under the cont…

Read all of it on Contracts Finder →

Details

What the buyer calls it
NCC258 Design and Build of County Hall Solar Carport, Battery Storage and Electric Vehicle Charging Points
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
19 Jul 2020
Work ends
31 Oct 2022

Who the buyer named

Lauren Morgan was the named contact on this notice.