Skip to the main content
The Crier

New Museum Project - Trade Package TP5150: Master Systems Integrator

Museum of LondonLondonservices
Your saved contracts

What the buyer wrote

The Smart Building Contractor shall be responsible for the design development, coordination, supply, delivery, installation, testing, commissioning, demonstration and handover of the integration of the building sub-system networked devices required to achieve the required ‘Smart’ connected working environment as detailed within this specification.

Bid for this and lost? There is a short window in which the decision can be questioned.

Details

What the buyer calls it
New Museum Project - Trade Package TP5150: Master Systems Integrator
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
services
Where
in London

Who the buyer named

Emily Durant was the named contact on this notice.

edurant@museumoflondon.org.uk