New Museum Project - Trade Package TP5150: Master Systems Integrator
What the buyer wrote
The Smart Building Contractor shall be responsible for the design development, coordination, supply, delivery, installation, testing, commissioning, demonstration and handover of the integration of the building sub-system networked devices required to achieve the required ‘Smart’ connected working environment as detailed within this specification.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- New Museum Project - Trade Package TP5150: Master Systems Integrator
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- services
- Where
- in London
- Kind of work
- Software development, Building surveying and inspection
Who the buyer named
Emily Durant was the named contact on this notice.
