Skip to the main content
The Crier

New tender: Manufacture of Walkway, No.2 Dock, Portmsouth Historic Dockyard

Your saved contracts

What the buyer wrote

Construction of a self-supporting metal walkway, balustrading, handrails and a flight of stairs, and four mounts for interpretative panels to affix to balustrading. To be situated beneath HMS Victory, a wooden vessel of international importance, within No. 2 Dock, which forms part of a Scheduled Monument and Grade I listed structure. Therefore there should be no physical impact on the ship or dock stonework during installation or operation phases. Walkway should be made of removable pieces allowing for maintenance of it and the dock beneath and the ship above.

Details

What the buyer calls it
New tender: Manufacture of Walkway, No.2 Dock, Portmsouth Historic Dockyard
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
3 Feb 2020
Work ends
29 May 2020

Who the buyer named

Ethan Fleming was the named contact on this notice.

tenders@nmrn.org.uk