Skip to the main content
The Crier

NNU Design MKUH ITT 145

Your saved contracts

What the buyer wrote

The Milton Keynes University Hospital (MKUH) is looking to identify a lead design and technical consultancy with the appropriate experience to bid to supply it with professional services to help the Trust develop a detailed design and for the reconfiguration of the layout of the Trust's Neonatal Unit. These professional services align with Stages 3, 4 and 5 in the RIBA Plan of Work 2013. These services include: Stage 3 & 4 appointment: • Detailed Design: Architectural services to help develop the preferred scheme and produce schedules of work and detail design drawings for the tender package; • MEP services strategy arising from the preferred layout option; • Engineering - Detail MEP…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

ADP Architecture Limited£69.8kends (31 Oct 2019)

Details

What the buyer calls it
NNU Design MKUH ITT 145
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
22 Jun 2019
Work ends
31 Oct 2019

Who the buyer named

Lynda Furness was the named contact on this notice.

lynda.furness@mkuh.nhs.uk