NTHF preliminary design study for Coolant Test Module Number 1: High Temperature Gas
What the buyer wrote
NTHF preliminary design study for Coolant Test Module Number 1: High Temperature Gas
Details
- What the buyer calls it
- NTHF preliminary design study for Coolant Test Module Number 1: High Temperature Gas
- How they are buying
- Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 1 Feb 2020
- Work ends
- 1 Jun 2020
Who the buyer named
Phil Perkins was the named contact on this notice.
