Skip to the main content
The Crier

(NU/1210) Supply of an 80kWe RATED Biogas CHP (Combined Heat and Power) Unit

Your saved contracts

What the buyer wrote

An anaerobic digester (AD) was installed at the Newcastle University site at Cockle Park Farm, Morpeth in 2010. This AD requires a 3-phase supply, and the farm only had 1-phase, so it was run off a 30kW generator. This was insufficient to operate the motors required for solid feedstock (peak demand 72kW). A back-to-back converter rated at 100kW was installed in 2015, enabling the AD to operate with solid feedstock, producing up to 1100 cubic metres of biogas per day. To utilise this biogas effectively, a combined heat and power unit (CHP) is now required, rated at 80kWe (3 phase), and installed adjacent to the AD plant. This will be connected electrically to the back-to-back converter, and t…

Read all of it on Contracts Finder →

Details

What the buyer calls it
(NU/1210) Supply of an 80kWe RATED Biogas CHP (Combined Heat and Power) Unit
How they are buying
The buyer did not say
Work starts
11 Nov 2016
Work ends
31 Mar 2017
Kind of work
Energy

Who the buyer named

Mrs Natalie Morton was the named contact on this notice.

natalie.morton@ncl.ac.uk