Skip to the main content
The Crier

(NU/1408) Supply of one 2MW Drive Control Panel and two 1.2MW Motors to Newcastle University Dynamic Gearbox Test Facility

Your saved contracts

What the buyer wrote

As part of the UK Rail Research and Innovation Network (UKRRIN), Rolling Stock Centre initiative, Newcastle University's Design Unit have been awarded a grant by HEFCE to design and build a bespoke, state of the art Dynamic Gearbox Test Facility including a climate chamber for testing of gearboxes and traction drives in extreme environments. As part of this the University is tendering for a drive system consisting of a water cooled low harmonic drive system capable of power regeneration and two motors More detail can be found in the tender documentation which can be found by registering your interest and accessing the the ITT event, which can be done at: https://procontract.duenorth.com/…

Read all of it on Contracts Finder →

Details

What the buyer calls it
(NU/1408) Supply of one 2MW Drive Control Panel and two 1.2MW Motors to Newcastle University Dynamic Gearbox Test Facility
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
goods
Suitable for small firms
The buyer says yes. What that is worth
Work starts
1 Oct 2018
Work ends
29 Mar 2019

Who the buyer named

Emma Barksby was the named contact on this notice.

emma.barksby@ncl.ac.uk