(NU/1451) Supply and Installation of a Self-contained, tilting, hydraulic flume with wave generator
What the buyer wrote
As part of the UK Collaboratorium for Research on Infrastructure and Cities, funded by the Engineering and Physical Sciences Research Council, Newcastle University is the one of the UK's demonstration sites for water infrastructure. As part of this funding programme there is an opportunity to locate a large, self-contained, tilting hydraulic flume with wave generator in the Novak Lab, Stephenson Building. The flume will be used for both research and teaching alike. This is timely as the Stephenson Building is undergoing a major redevelopment programme from 2020. The scope of this contract is for the design, supply, delivery and installation of the flume as detailed in Invitation to Tender d…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- (NU/1451) Supply and Installation of a Self-contained, tilting, hydraulic flume with wave generator
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- goods
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 22 Mar 2019
- Work ends
- 30 Sep 2019
- Kind of work
- Construction
Who the buyer named
Natalie Morton was the named contact on this notice.
