(NU/1528) Main Contractor for Sir Terry Farrell Building Refurbishment
What the buyer wrote
This contract is a call-off from the NEUPC Minor Works Framework Agreement EFM2025NE and consists of refurbishment works to the whole of the building both internal and external, respecting the existing catering outlet which is let and will remain live throughout the project duration. The building layout will require structural modifications including installation of a new lift shaft. The design and Project Management team have already been appointed for this scheme and the Design Led portion of this team will be novated to the Main Contractor at RIBA Stage 4 should your appointment continue beyond Stage 2 of the procurement process.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- (NU/1528) Main Contractor for Sir Terry Farrell Building Refurbishment
- How they are buying
- The buyer did not say
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 20 Oct 2020
- Work ends
- 20 Apr 2020
- Kind of work
- Refurbishment and fit-out, Architecture and design
Who the buyer named
Emma Barksby was the named contact on this notice.