OPA T518/1560 OFD Thanckes - Thanckes Tank Farm Project - (TTFP) Front End Engineering Design, Detail Design and Principal Designer
The Oil and Pipelines Agencyservices
What the buyer wrote
The scope of service for the Design Phase includes review of the Front-End Engineering Design (FEED) as developed and supplied by OPA, and the proposal and submission of any recommendations that the Consultant feels necessary to meet the required standards and specifications in design or improve the efficiency of the Construction Phase. Once the FEED is frozen and accepted by the OPA, the Consultant is to complete the design up to ‘Issued for Construction’ status of all the design documentation. Please refer to all ITT documents.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- OPA T518/1560 OFD Thanckes - Thanckes Tank Farm Project - (TTFP) Front End Engineering Design, Detail Design and Principal Designer
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Kind of work
- Building surveying and inspection
Who the buyer named
Karen Robinson was the named contact on this notice.
