OPA/T577 - OFD Thanckes – NATO TANKS Phase 2 Electrical Instrumentation and Building Services.
What the buyer wrote
For each tank the Overfill Protection system and ATG Level system are fully functional and operable. Phase-2 will ready the HV System to enable the operation of Transfer Pumps (1+1). In addition, a new NATO-BPCS will be Installed to allow ease of operation. This requirement covers Phase 2 EC&I installation scopes of works
Details
- What the buyer calls it
- OPA/T577 - OFD Thanckes – NATO TANKS Phase 2 Electrical Instrumentation and Building Services.
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Kind of work
- Electrical installation
Who the buyer named
Annie Murray was the named contact on this notice.
