OPA/T588 OFD Loch Striven - Installation of new ROSOV along with Associated Tank Staging Modifications – Tank 14
What the buyer wrote
As a part of futureproofing and improving the tank overfill protection at Loch Striven, it is required to replace the tank-side issue & receipt manual gate valve with an actuated valve and carry out platform modifications to enhance the practicality of operating the asset.
Details
- What the buyer calls it
- OPA/T588 OFD Loch Striven - Installation of new ROSOV along with Associated Tank Staging Modifications – Tank 14
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- goods
- Kind of work
- Construction
Who the buyer named
Annie Murray was the named contact on this notice.
