Skip to the main content
The Crier

Ophir Road Footbridge Waterproofing

Your saved contracts

What the buyer wrote

The footbridge spans over the A338 Wessex Way and provides a vital link over a busy dual carriageway. The bridge comprises a single span over the carriageway with spiral ramps at either end. The construction is reinforced concrete bridge supported on reinforced concrete ramps. There are four movement joints two of which are halving joints. The surfacing comprises Hot Rolled Asphalt with a depth at the crown of 65mm going down to 30mm at the edges. The works to both structures are as follows: • To remove the existing surfacing. • Remove drainage channels • Prepare the deck ready to accept the Permaphalt • Apply Permaphalt • Apply Asphalt Paving • Clean drainage system Proj…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Ophir Road Footbridge Waterproofing
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
24 Sep 2017
Work ends
31 Oct 2017

Who the buyer named

Strategic Procurement was the named contact on this notice.

procurement@bournemouth.gov.uk