Skip to the main content
The Crier

Overstone School - Replacement Ceiling

Your saved contracts

What the buyer wrote

1. To remove furniture and clear fallen debris as required. To sheet up, strip, remove and dispose of the redundant artex and plasterboard ceiling. To include the removal of the fibreglass insulation and weekend working as required. To vacuum and decontaminate and carry out air reassurance testing. 2. To supply and install 12.5mm plasterboard to replace that removed. To tape, joint, sand and prepare for decorating. To supply and install MMMF insulating loft roll to replace that removed. To supply and apply 2 coats of white emulsion paint. All as discussed.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Scancross£10kends (29 Nov 2019)

Details

What the buyer calls it
Overstone School - Replacement Ceiling
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
1 Nov 2019
Work ends
29 Nov 2019

Who the buyer named

Tina Rutter was the named contact on this notice.

a-trutter@buckscc.org