The proposed strengthening works involves taking down 450mm thick, 1000mm high and about 180 linear m parapet walls. The mortared wall below road level will be raked out, repointed and pressure grouted. Gabion walls will be constructed in front of the existing repointed walls which will act as a buttress. The gabion baskets will be up to carriageway level. New 450mm wide, 1200mm high masonry faced parapet wall with concrete infill built along the same alignment. Weep holes shall be cored through the grouted wall at 2m centres.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Oxenhope Retaining Walls Strengthening
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 2 Jul 2017
- Work ends
- 31 Oct 2018
- Kind of work
- Construction