The proposed strengthening works involves taking down 450mm thick, 1000mm high and about 180 linear m parapet walls. The mortared wall below road level will be raked out, repointed and pressure grouted. Gabion walls will be constructed in front of the existing repointed walls which will act as a buttress. The gabion baskets will be up to carriageway level. New 450mm wide, 1200mm high masonry faced parapet wall with concrete infill built along the same alignment. Weep holes shall be cored through the grouted wall at 2m centres.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Jagger Construction Ltd£175kends (31 Oct 2018)

Details

What the buyer calls it
Oxenhope Retaining Walls Strengthening
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
2 Jul 2017
Work ends
31 Oct 2018
Kind of work
Construction

Who the buyer named

Emma Prest was the named contact on this notice.

emma.prest@bradford.gov.uk