P0568 - A38(M) Aston Expressway Tame Valley Viaduct Strengthening Works
What the buyer wrote
The Council wishes to establish a Contract to carry out major structural strengthening work of the A38(M) Aston Expressway to ensure the safety of the structure and extend the life of the asset. The scope of the works includes: o Strengthening of the steel box girders carrying the viaduct deck to enhance their carrying capacity and overall longevity o Painting of the entire external and internal surfaces of the steel box girders o General refurbishment of the viaduct's deck components, piers and abutments. The contract is to be based on the amended NEC 3 Option C -Target Contract with Activity Schedule. The contract period is expected to be up to …
Details
- What the buyer calls it
- P0568 - A38(M) Aston Expressway Tame Valley Viaduct Strengthening Works
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 23 Feb 2020
- Work ends
- 1 Nov 2025
Who the buyer named
Charlie Short was the named contact on this notice.
