PAH Design, Supply and Installation of Standby Generator Tender Specification
What the buyer wrote
The NHS Princess Alexandra Hospital Trust requires one of its existing standby generators to be replaced with a new unit of modern design, to assure availability, continuity of power and more predictable maintenance costs of the facility for the long term. This contract will become a full Turnkey package and require contractors to take on full Design and Build responsibility, including all Civils works, Mechanical and Electrical installation. This initial Phase 1 A though is for Contractors invited to offer bids for the supply of 1 No. diesel generating set, with a prime power output of 1500kVA, 1200kW and a standby output of 1650kVA, 1320kW, at 0.8 power factor, 3 phase, 4 wire, 415/240…
Details
- What the buyer calls it
- PAH Design, Supply and Installation of Standby Generator Tender Specification
- How they are buying
- The buyer did not say
- Work starts
- 17 Mar 2018
- Work ends
- 31 Mar 2018
Who the buyer named
Sophie Rider was the named contact on this notice.
