Passenger Lift Refurbishment - Redmonds Building
What the buyer wrote
The passenger lift at Redmonds building was reported to LJMU estates as there was a loud grinding sound when the lift was in operation. Hard FM contractor (Atlas Services previously Salisbury) sent their lift engineer (Pickering's) out to investigate the noise. Pickering's reported back the lift is a closed protocol system direct with Otis Lift Services and a large refurbishment will be required due to obsolete parts. We contacted Otis Lift services and met the engineer onsite to review the fault. The Otis engineer diagnosed the fault with the bearings and recommended the lift could be repaired; however the part will have to be sourced from their Spanish factory because of the model of our l…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Passenger Lift Refurbishment - Redmonds Building
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Work starts
- 24 Apr 2025
- Work ends
- 25 Jun 2025
- Where
- in the North West
Who the buyer named
Lowri Willis was the named contact on this notice.
