What the buyer wrote
Supply of Materials, Plant and Labour to carry out bituminous and concrete patching, surfacing and pavement construction operations including planing,(milling) paving, iron work and associated ancillary works, adjustment and renewal, in-situ and ex-situ recycling, footway surfacing and asphalt kerbing. The scope will also include emergency response. Area 1 Cornwall, Devon. Location to include A30 and the A38 all-purpose trunk roads to the west of M5 junction 31 and the A30 from the M5 junction 29 to the eastern end of the Honiton bypass and the A35 Honiton to Bere Regis. Area 2 Bristol, Devon, Dorset, Gloucestershire, Somerset, Wiltshire. Location to include M4 (junction 15 to Second S…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Pavements Framework - Lot 10 South West (Minor)
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 8 May 2018
- Work ends
- 8 May 2022
Who the buyer named
The buyer published a contact address on this notice.
