Skip to the main content
The Crier

Pedestrian Bridge at Shanklin Cliff Lift

Your saved contracts

What the buyer wrote

The Isle of Wight Council invites Tenders from suitably qualified providers for the provision of a new pedestrian bridge at Shanklin Cliff Lift. The project will involve the installation of a new pedestrian walkway connecting the existing two car lift tower and cliff top within the Conservation area located along the Esplanade, Shanklin, Isle of Wight. The work also includes the associated external works along the cliff top incorporating level changes and threshold construction. The contract will be let under JCT Design and Build Contract 2011 terms and conditions. The contractor will be responsible for and should allow in their pricing for all necessary detailed site investigations, s…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Pedestrian Bridge at Shanklin Cliff Lift
How they are buying
The buyer did not say
Type
works
Work starts
23 Jun 2016
Work ends
7 Apr 2017

Who the buyer named

Mrs Claire Sarr was the named contact on this notice.

claire.sarr@iow.gov.uk