Skip to the main content
The Crier

Pedestrian Bridge at Shanklin Cliff Lift

Your saved contracts

What the buyer wrote

The Isle of Wight Council invited Tenders from suitably qualified providers for the provision of a new pedestrian bridge at Shanklin Cliff Lift. The project involves the installation of a new pedestrian walkway connecting the existing two car lift tower and cliff top within the Conservation area located along the Esplanade, Shanklin, Isle of Wight. The work also includes the associated external works along the cliff top incorporating level changes and threshold construction.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

MCM Construction Ltd£499.9kends (7 Apr 2017)

Details

What the buyer calls it
Pedestrian Bridge at Shanklin Cliff Lift
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
9 Aug 2016
Work ends
7 Apr 2017

Who the buyer named

Mrs Claire Sarr was the named contact on this notice.

claire.sarr@iow.gov.uk