Personal Load Carriage Equipment (PLCE) Component Testing FATS5 - DCC Survivability
What the buyer wrote
The Authority requires a review of the 39 technical specifications for Personal Load Carriage Equipment (PLCE) to identify all prescriptive equipment components, materials and manufacturers. This includes: Identify required testing and determination of performance criteria required for components and materials. Complete required testing as identified to performance criteria required for components and materials, including the Bundesman Rain Shower and Drying testing. Update references of standards to latest editions (e.g. British Standards), where applicable. Revise and edit specifications as determined, providing them back to the Authority in the prescribed format.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Personal Load Carriage Equipment (PLCE) Component Testing FATS5 - DCC Survivability
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 16 Jan 2019
- Work ends
- 26 Apr 2019
- Kind of work
- Building surveying and inspection
Who the buyer named
The buyer published a contact address on this notice.
