Skip to the main content
The Crier

Peter Pan Play Area Refurbishment

Your saved contracts

What the buyer wrote

The scope of the works is to extend the current play area into the adjacent grass areas to introduce 6 new items of equipment. Existing edging will be repaired & new low maintenance recycled plastic edging will be introduced. The areas will be play bark as existing. All existing fencing will be re-used with the addition of 2 new panels. The tarmac circulation area will also be extended. On the west side of the play area is a well-used desire line across the grass to the park roadways. It is proposed to construct a porous macadam surface along this route with a minimum width of 1.5m to improve access.

Details

What the buyer calls it
Peter Pan Play Area Refurbishment
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
3 Jun 2018
Work ends
20 Jul 2018

Who the buyer named

David Sullivan was the named contact on this notice.

dave.sullivan@hullcc.gov.uk