What the buyer wrote
The scope of the works is to extend the current play area into the adjacent grass areas to introduce 6 new items of equipment. Existing edging will be repaired & new low maintenance recycled plastic edging will be introduced. The areas will be play bark as existing. All existing fencing will be re-used with the addition of 2 new panels. The tarmac circulation area will also be extended. On the west side of the play area is a well-used desire line across the grass to the park roadways. It is proposed to construct a porous macadam surface along this route with a minimum width of 1.5m to improve access.
Details
- What the buyer calls it
- Peter Pan Play Area Refurbishment
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 3 Jun 2018
- Work ends
- 20 Jul 2018
- Kind of work
- Refurbishment and fit-out
Who the buyer named
David Sullivan was the named contact on this notice.
