Pevensey Levels Floating Pennywort Control 2017-18
What the buyer wrote
The overall aim and objective of the contract is to control and eradicate floating Pennywort from the Pevensey Levels wetlands. This will include the following: a) By removing biomass mechanically in the late summer (i.e. August onwards) using a sieve bucket. This needs to be done carefully in order to ensure that the maximum plant material is removed and placed safely at least 3 metres from the ditch edge. b) Any residual infestation will be sprayed twice with Glyphosate with Topfilm using a specification provided by the Environment Agency. No substitutes can be used immediately after mechanical control and 4 and 6 weeks after mechanical clearance. Spraying should only be done where…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Pevensey Levels Floating Pennywort Control 2017-18
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 31 Jul 2017
- Work ends
- 31 Mar 2018
- Kind of work
- Waste and environment, Grounds maintenance and landscaping
Who the buyer named
The buyer published a contact address on this notice.
