Phase 10 Sheltered Housing Electrical Fire Safety Upgrade
What the buyer wrote
The London Borough of Hillingdon intends to upgrade Fire Detection to LD1 and replace existing electrical consumer units within Sheltered Housing Dwellings. 1. 1-26 Childs Court, This is a sheltered housing Scheme consisting of 26 Dwellings (26No. Internal One bed dwellings) 2. 1-37 Darrell Charles Court, This is a sheltered housing scheme consisting of 37 Dwellings (37No.Internal One bed dwellings) 3. 1-25 Drayton Court, This is a sheltered housing scheme consisting of 23 Dwellings (23No.Internal One bed dwellings) 4. 1-25 Yiewsley Court, This is a sheltered Housing scheme consisting of 25 Dwellings (25No. Internal One bed dwellings) 5. 1-76 Kelf Grove, This is a sheltered Ho…
Details
- What the buyer calls it
- Phase 10 Sheltered Housing Electrical Fire Safety Upgrade
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 14 Dec 2020
- Work ends
- 8 Feb 2021
- Kind of work
- Electrical installation
Who the buyer named
Kirandeep Roopraye was the named contact on this notice.
