Phase 6 General Needs Electrical Fire Safety Upgrade
What the buyer wrote
The London Borough of Hillingdon intends to upgrade the existing fire detection and electrical consumer units within 401 No Dwellings in the HA4 area. 401 No. 1,2 & 3 Bedroom Dwellings including: 130 No. Flats, 33 No. Maisonettes, 220 No. Houses, 3 No. Bungalows The works include, but not limited to the Design, supply, installation, commissioning and hand-over of complete and fully functional LD2 Fully Interlinked Fire Detection System & Upgrade of electrical consumer unit to BS7671 within 401 No. general needs dwellings. The Installer is expected to provide his rates for the entire Schedule of Works (SOW) listed even if the work is to be performed by a sub-Installer or specia…
Details
- What the buyer calls it
- Phase 6 General Needs Electrical Fire Safety Upgrade
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 4 Oct 2020
- Work ends
- 7 Dec 2020
- Kind of work
- Electrical installation
Who the buyer named
Michael Breen was the named contact on this notice.
