Phase 8 Sheltered Housing Electrical Fire Safety Upgrade
What the buyer wrote
The London Borough of Hillingdon intends to upgrade Fire Detection to LD1 and replace existing electrical consumer units within Sheltered Housing Dwellings. 1. 1-32 Ascott Court, This is a sheltered housing scheme consisting of 39 Dwellings (32No. Internal One bed dwellings and 7No. External One bed dwellings) 2. 1-30 Barden Court, This is a sheltered housing scheme consisting of 30 Dwellings (30 No.Internal One bed dwellings) 3. 24-39 Roberts Close, This is a sheltered housing scheme consisting of 64 Dwellings (16No. Internal One bed dwellings and 48 No. External One bed dwellings) 4. 1-32 Barr Lodge, This is a sheltered housing scheme consisting of 47 Dwellings (32 No.Internal …
Details
- What the buyer calls it
- Phase 8 Sheltered Housing Electrical Fire Safety Upgrade
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 7 Dec 2020
- Work ends
- 25 Jan 2021
- Kind of work
- Electrical installation
Who the buyer named
Paul Soward was the named contact on this notice.
