Phase 9 Sheltered Housing Electrical Fire Safety Upgrade
What the buyer wrote
The London Borough of Hillingdon intends to upgrade Fire Detection to LD1 and replace existing electrical consumer units within Sheltered Housing Dwellings. 1. 1-46 James Court, This is a sheltered housing block consisting of 50 Dwellings (46 No. Internal Two bed dwellings and 4 No. External One bed dwellings) 2. 1-45 St Catherines Farm Crt, This is a sheltered housing scheme consisting of 30 Dwellings (30 No.Internal One bed dwellings) 3. 8-56 Rylstone, This is a sheltered housing scheme consisting of 32 Dwellings (20 No.Internal One bed dwellings and 12 No. External One bed dwellings) 4. 1-31 Wallis House, This is a sheltered Housing scheme consisting of 31 Dwellings (31 No. In…
Details
- What the buyer calls it
- Phase 9 Sheltered Housing Electrical Fire Safety Upgrade
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 7 Dec 2020
- Work ends
- 25 Jan 2021
- Kind of work
- Electrical installation
Who the buyer named
Paul Soward was the named contact on this notice.
