Skip to the main content
The Crier

PHE - Porton Down Building 6 Roof Refurbishment

Your saved contracts

What the buyer wrote

PHE require the refurbishment of Building 6 roof: Building 6 is located at the west end of the main Porton site. It houses the main site steam boilers and provides accommodation for the PMC as well as a number of PHE and external departments. The existing roof coverings have reached the end of their serviceable life. The original finishes have been overlaid and there is significant evidence of the overlays breaking down. There are several levels to Building 6 roof and the intention is to replace all finishes on every different level. All of the existing roofs have been laid to fall except for the highest section above the boilers which is flat. There is considerable ponding in several are…

Read all of it on Contracts Finder →

Details

What the buyer calls it
PHE - Porton Down Building 6 Roof Refurbishment
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
24 Sep 2017
Work ends
29 Mar 2018

Who the buyer named

Professor Derrick Crook was the named contact on this notice.

derrick.crook2@phe.gov.uk