What the buyer wrote
PHE require the refurbishment of Building 6 roof: Building 6 is located at the west end of the main Porton site. It houses the main site steam boilers and provides accommodation for the PMC as well as a number of PHE and external departments. The existing roof coverings have reached the end of their serviceable life. The original finishes have been overlaid and there is significant evidence of the overlays breaking down. There are several levels to Building 6 roof and the intention is to replace all finishes on every different level. All of the existing roofs have been laid to fall except for the highest section above the boilers which is flat. There is considerable ponding in several are…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- PHE - Porton Down Building 6 Roof Refurbishment
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 24 Sep 2017
- Work ends
- 31 Mar 2018
- Kind of work
- Refurbishment and fit-out
Who the buyer named
Professor Derrick Crook was the named contact on this notice.
