Pont Cyfnant Bridge Strengthening
What the buyer wrote
The works are the following: Excavate the fill material behind the masonry arch of Pont Cyfnant, retaining the spandrel walls and masonry arch itself. The interior masonry is to be cleaned and masonry anchors installed at regular intervals to tie the masonry to the new concrete fill. The arch fill is to be replaced with concrete in several lifts and waterproofed at the finished level. A new carriageway surface, kerbs and paved verges are then to be installed across the bridge and tapered into the pre-existing carriageway on both bridge approaches.
Details
- What the buyer calls it
- Pont Cyfnant Bridge Strengthening
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Kind of work
- Civil engineering and groundworks
Who the buyer named
The buyer published a contact address on this notice. Questions closed on 23 Apr 2025, 12:00 BST.