Skip to the main content
The Crier

Poplar School - Heating System

Your saved contracts

What the buyer wrote

Replace present Millennium Build Boiler House system with a modular, efficient and load matched boiler arrangement with the option of Trend IQ4 controls. Whilst load matching is a design requirement the system should be able to be expanded should future dictate. Worcester Bosch or similar approved.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

T Brown Group Ltd£34.9kends (31 Aug 2018)

Details

What the buyer calls it
Poplar School - Heating System
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
25 Jul 2018
Work ends
31 Aug 2018

Who the buyer named

Mr Nathan Liburd was the named contact on this notice.

nathan.liburd@merton.gov.uk