PP18110 - Windows Replacement At Dovecotes Primary School
What the buyer wrote
The works comprise the replacement of the existing metal framed single glazed windows to elevations identified on contract drawing number APM18333-BS-TD-01 with new powder coated double glazed aluminum windows. Carefully and safely strip out existing metal framed glazing and dispose off-site via licensed disposal. Ensure existing heating system and flooring is always protected from damage. Prepare openings to receive new windows. Supply and install purpose-made powder coated aluminium, windows, as per contract drawings, to comprise: - I. Appropriate section Comar 5pi 60mm or similar approved, commercial thermally broken aluminium, white (RAL 9910), semi-gloss powder coated framing system, I…
Details
- What the buyer calls it
- PP18110 - Windows Replacement At Dovecotes Primary School
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 5 Aug 2018
- Work ends
- 31 Aug 2018
Who the buyer named
Gemma Lloyd was the named contact on this notice.
