What the buyer wrote
Works to create a permanent fallback control room at Preston station. Work includes demolition of partition walls to create large open plan space, redecoration and installation of power/data/aerial cabling.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Preston Police station Refurbishment work
- How they are buying
- The buyer did not say
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 15 Feb 2019
- Work ends
- 31 May 2019
Who the buyer named
Rachel Astbury was the named contact on this notice.
