Princess Pier, Torquay - Removal of Pier Head Widening and Ancillary Works

Your saved contracts

What the buyer wrote

The pier head widening, including its diagonal props and supporting steel piles, and the adjacent timber landing are to be wholly removed down to below sea bed level. Access to the concrete pier beyond the 'step' arising following removal of the widening is to be installed with ambulant disabled compliant stepped, and wheelchair access compliant ramped installation, both formed with robust steel framing, hardwood timber or composite surfacing, and non-slip finishes. Original style railings are to be installed as edge protection to match existing railing to both landward and seaward elevations of the concrete surface exposed by the removal of the widening. The concrete surface is to be sla…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

M.W. Benney Limited£281.9kends (19 Mar 2018)

Details

What the buyer calls it
Princess Pier, Torquay - Removal of Pier Head Widening and Ancillary Works
How they are buying
The buyer did not say
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
8 Jan 2018
Work ends
19 Mar 2018

Who the buyer named

Mr Adam Harmer was the named contact on this notice.