Procurement of a Dust Control System for Tees Dock Warehouse A
What the buyer wrote
The requirement is to design, manufacture, deliver, install, test and complete a dust dilution ventilation system for bays 1, 2 and 3 of Tees Dock Warehouse A. The dust dilution ventilation system shall consist of 3 separate systems (one for each bay). Each bay being 33m wide x 90m long x 14m apex (38,000m3).The dust dilution ventilation system shall be suitably designed, manufactured, installed, tested and completed so that when in operation it reduces the levels of inhalable and respirable Agribulk dust to within acceptable levels in full compliance with the requirements of the Control of Substances Hazardous to Health (COSHH) Regulations 2002.
Details
- What the buyer calls it
- Procurement of a Dust Control System for Tees Dock Warehouse A
- How they are buying
- Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
- Type
- goods
- Framework
- Yes: joining it lets you bid for call-offs without a new tender each time
- Where
- in the North East
- Kind of work
- Supplies and catering, Heating, plumbing and mechanical
Who the buyer named
The buyer published a contact address on this notice.
