Production survey in West England Forest District
What the buyer wrote
Production survey plots will be established following one of the method options and based on both the Forest Mensuration handbook 2006, the Forestry Commission Field Guide for Timber Measurement 2008 and the Forestry Commission Survey Handbook, 3rd edition 2007. There are 2 options for data collection available for this contract method 1 - by tape and paper documentation plus input and calculation in an Excel package, method 2 - electronic callipers. Only 1 of the methods will be used as declared by the contractor. Both methods will include: Possible sub-compartment stratification Plot navigation, numbering, recording grid reference and size choice - circular plots will always be used of…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Production survey in West England Forest District
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 2 Aug 2015
- Work ends
- 18 Mar 2016
Who the buyer named
Emma Roberts was the named contact on this notice.
