Skip to the main content
The Crier

Proposed Boiler Replacement at Merefield Special School

Your saved contracts

What the buyer wrote

The Mechanical Contractor shall include for the disconnection and removal of existing boiler plant as detailed on the drawings which is to include the existing feed and expansion tank, cold feed and open vent and all associated pipework. The installation of a new boiler cascade system consisting of 4 no. Ideal Evomax 2 modulating boiler modules fitted to a mounting frame complete with header kits and plate heat exchanger

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Details

What the buyer calls it
Proposed Boiler Replacement at Merefield Special School
How they are buying
Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
Where
in the North West

Who the buyer named

The buyer published a contact address on this notice.

cdp@sefton.gov.uk