Proposed Demolition of Former Charborough Road Site Buildings
What the buyer wrote
The physical works on site comprises the demolition of the existing buildings as indicated on the Demolition plan annexed to this questionnaire but also the removal of all loose and fixed furniture and equipment, the removal of all asbestos, backfilling of the old basement boiler room and excavations together with the capping off of redundant underground drainage.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Proposed Demolition of Former Charborough Road Site Buildings
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 27 Feb 2019
- Work ends
- 4 Jun 2019
Who the buyer named
Tristan Faith was the named contact on this notice.
